1-
Importing and fixing wooden burdens.
2-
Treatment and settlement the spaces
by cement, if there is.
3-
Importing and fixing nets – made in
England weight 1600 Gram.
4-
Importing and Spreading Cement upon
walls ( Tartasha ) added to special
material (SBR) (washed sand) –
mechanical mixing with special
mixer.
5-
Importing and doing strings and
suitable balance.
6-
Importing and fixing angles – made
in England (Ex payment) or by
rolling up and cobs – made in
England.
7-
Importing and doing the first face
surveyor layer of inside (washed
sand)
8-
Importing and doing the second face
surveyor layer of outside (washed
sand).
9-
Washing directions with clean water.
10- Importing and doing a layer of
Primer Foundation.
11- Importing and doing GTC, Jotin,
Humpel or Saudian Spico 5mm or 3mm
according to reliable sample.
12- Importing and doing First face of
protection (Acrylic) according to
reliable color.
13- Importing and doing second face
of protection – Acrylic.
|