|
1-
Importing and doing foam concrete
with thickness 10 cm.
2-
Importing and doing surveyor layer 2
cm.
3-
Importing and painting a layer of
primer foundation.
4-
Importing and fixing humid blamer
Kuwait, Emirate or Saudi blamer 4 mm
200 gm polyester.
5-
Importing and doing a layer of
surveyor to protect blamer. |